Demonstration
WP5 measurement methodologies will be implemented in the testing facilities, which will be functional in T7.1 at first characterizing the actual product and validating the results of the modelling work package (WP4).
The quality of the facilities measurement will be provided in T7.2.
After the project, CoCe will assist local companies in designing specific façade solutions. T7.3 will demonstrate the standard workflow of the CoCe.
Task
T7.1 Assessment of facade products
T7.2 Cross-checking of measurement infrastructures
T7.3 Demonstrating CoCe’s workflow and planning of future activities