Demonstration

WP5 measurement methodologies will be implemented in the testing facilities, which will be functional in T7.1 at first characterizing the actual product and validating the results of the modelling work package (WP4).

The quality of the facilities measurement will be provided in T7.2.

After the project, CoCe will assist local companies in designing specific façade solutions. T7.3 will demonstrate the standard workflow of the CoCe.

Task

  • T7.1 Assessment of facade products

  • T7.2 Cross-checking of measurement infrastructures

  • T7.3 Demonstrating CoCe’s workflow and planning of future activities